Within this project, the energy pilots provided 100% of the hospital’s heating and cooling needs exclusively through the building’s foundation. This innovative method by which the heating and cooling source is provided by the foundation system ensures a sustainable method of creating a local source of renewable energy, significantly contributing to the reduction of thermal energy costs at the building operation stage.